User's Manual
2-42
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
...........................................................................................................................................................................................................................................................
Modular Cell 4.0B and WNG24-BC cabinet handling,
placement, anchoring and grounding
Attach the cabinets
together at the square
cable support (with second
battery cabinet only)
Important! If installing the first battery cabinet, do not perform
the instructions below. Note that the first battery cabinet will be
connected to the Modular Cell 4.0B cabinet at the cable support
when the cable interface is installed in Chapter 4. Skip to Install
anchoring bolts or anchor assemblies and level the battery cabinet(s) on
Page 2 - 45 to continue the installation.
If installing the second battery cabinet, continue with the
instructions below.
Perform the following steps to attach the cabinets together at the cable
support.
Important! If there is no battery retaining bracket mounted on
the top shelf (shelf 5), skip the first step.
................................................................................................................................
............................................
1 Refer to the figure below and remove the top (shelf 5) battery retaining
bracket from the first battery cabinet. Do not replace the retaining
bracket at this time.
BATTERY
SHELF 5
BATTERY
SHELF 3
BATTERY
SHELF 4
SHELF 5 BATTERY
RETAINING
BRACKET