User's Manual

2-46
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
...........................................................................................................................................................................................................................................................
Modular Cell 4.0B and WNG24-BC cabinet handling,
placement, anchoring and grounding
a. Place two expansion stud assemblies, or threaded rods, into
the front mounting holes using both washers on each
assembly. Refer to the figure below.
b. Place two expansion stud assemblies, or threaded rods, in the
back mounting holes, without the large washer on each
assembly.
c. Do not torque the nuts at this time.
Important! If the cabinet door does not align properly when
closed in the next step, the cabinet may be releveled until correct
door alignment is achieved, or the door may be adjusted, as
applicable. Refer to Door adjustment procedure on Page 2 - 76 for
the adjustment procedure. Since it may be necessary to re-level the
primary cabinet when connecting a battery or dual band cabinet,
you may wish to delay adjustment of the door(s) until all cabinets
have been placed, leveled, and anchored.
................................................................................................................................
............................................
2 If the cabinet being installed has a front heat exchanger, verify that the
cabinet door aligns properly when closed.
Important! When leveling the cabinet in the next step, the holes
for the cable supports must align with the holes in the opposite
cabinet.
PLATE WASHER
(REMOVED FOR
REAR MOUNTING
HOLES ONLY)
SPREADER
NUT
FLAT
WASHER
THREADED
ROD
NUT
REMOVABLE
SPACER