Mark and drill the anchor
holes
If not already accomplished during site preparation, use the following
procedure to mark and drill the anchor holes in a concrete surface.
Consult Flexent
Modular Cell 4.0/4.0B Outdoor Site Preparation
Guidelines, 401-703-413 for additional details.
................................................................................................................................
............................................
1 Check the bottom plate for the "F" front orientation marker. If it is not
in the correct location the bottom panel must be removed and
repositioned correctly. Refer to the figure below.
Important! Note that the base module may be mounted directly
on a concrete pad. Procedures for the preparation of other types of
mounting surfaces are the responsibility of the customer.
................................................................................................................................
............................................
2 Using the bottom plate as a marking template only, mark the four holes
identified as "A" for Zone 0, 1, and 2, installations. For Zones 3 and 4
installations, also mark the four holes identified as "B". Refer to the
figure below.
F
"
F" FRONT
O
RIENTATION
M
ARK ON
B
ASE PLATE