User's Manual

A- 27
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
............................................................................................................................................................................................................................................................
How to install the inner battery frame and level, anchor, and ground
.............................................................................................................................................................................................................................................................
the first or second EZBFo battery base modules
Overview
In this module the installer will perform the following procedures:.
Attach the internal ground cable and install the inner battery frame
into the outer battery frame
Attach the internal ground cable to the outer battery frame and
level and anchor the completed battery base module
Attach the site grounding cable to the outer frame of the battery
base module.
This module contains the following procedures:
Remove the two piece
battery retaining brackets,
separating the two parts if
applicable (Reference)
If the battery retaining brackets have not been previously removed
from the battery shelves, refer to Remove the two piece battery retaining
brackets, separating the two parts if applicable on Page A - 20 for
instructions, and remove the retaining brackets at this time.
Remove the two piece battery retaining brackets, separating
the two parts if applicable (Reference)
A - 27
Prepare the battery module inner frame and place it inside the
outer frame and attach the internal ground cable
A - 28
Level and anchor the battery base module A - 32
Connect the battery base module grounding cables A - 34