User's Manual

A- 41
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
............................................................................................................................................................................................................................................................
Identify the first EZBFo
battery base module 2
AWG DC cables
The first EZBFo battery base module 2 AWG DC cables are shown in
the figure below. Lengths are given for use with both primary cabinets
(right side installation) and dual band cabinets (left side installation,
which are longer). Note that the four +24V DC load cables (marked
red) are the longer of the eight cables.right side cables, but are the
shorter of the eight left side cables.:
+24V DC LOAD
CABLE FROM MODULAR CELL
CABINET (2 AWG) 1 of 4
MODULAR CELL
CABINET END
FIRST BATTERY
BASE MODULE END
2937 (115.6)
2784 (110.0)
24V
RETURN (RTN) DC CABLE FROM MODULAR CELL
CABINET (2 AWG) 1 of 4
3556 (140.0)