User's Manual

Finishing the installation
7- 17
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
............................................................................................................................................................................................................................................................
................................................................................................................................
............................................
4 Repeat Steps 1 through 3 for all RF antenna jumper cables.
Important! Antenna jumper cables must be tested. Refer to
Lucent Technologies Installation Engineering Handbook, 238,
Indoor Installation Antenna Testing (Reference).
Important! Before system operation, the RF antenna cable
sections must be tested, and the power output of the amplifiers
must be adjusted. Those tasks are a part of system test and
integration.
MODULAR CELL
4.0B PRIMARY OR
4.0B DUAL BAND
CABINET
THESE PARTS NOT
PRESENT ON
DUAL BAND CABINETS
TERMINAL BLOCK NOT PRESENT
ON CABINETS WITH INTEGRATED
POWER. THREE OR SIX FEED
THROUGH CORD GRIP SEALS,
DEPENDING UPON THE CABINET