Route the cables through
the conduit into the first
battery base module
Important! Routing of the alarm and thermal probe cables, as
well as the AC cable, through the conduit from the Modular Cell
4.0B cabinet to the first battery base module must be
accomplished prior to routing of the DC cables through the
conduit. DC cables must be routed last and individually taped in
the Modular Cell cabinet. No cables will be connected in the
Modular Cell cabinet at this time
Perform the following steps to route the cables through the conduit into
the first battery base module.
................................................................................................................................
............................................
1 Route the correct end of the alarm cable harness through the conduit
from the Modular Cell 4.0B cabinet to the first battery base module.
Refer to the figure on Page A - 46 for the first battery base module end
of the cables.
................................................................................................................................
............................................
2 Route the correct end of the thermal probe cable through the conduit
from the Modular Cell 4.0B cabinet to the battery base module.
................................................................................................................................
............................................
3 Route the correct end of the AC cable through the conduit from the
Modular Cell 4.0B cabinet to the first battery base module.
Important! When performing the next step leave sufficient
length in the Modular Cell cabinet to reach the HPDA at the top
right of the cabinet
................................................................................................................................
............................................
4 Route the correct ends of the eight DC cables through the conduit from
the Modular Cell 4.0B cabinet to the first battery base module.
Important! The next step is absolutely necessary to prevent
electrical shock and damage to equipment.