User's Manual

A- 51
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
............................................................................................................................................................................................................................................................
How to route and connect the signal cables in the first battery base
.............................................................................................................................................................................................................................................................
module
Overview
This procedure module provides instructions on how to route and
connect the signal cables in the first battery base module.
Instructions are given for right-hand (primary cabinet) installation. Left
hand installation (4.0B Dual Band cabinet) is the same except for the
routing of the cables into and through the 4.0B Dual Band cabinet. This
alternate routing is provided.
Step-by-step instructions are provided for the following tasks:
Description of heater pad and AC wiring installation in the battery base
module
The fuse, fuse alarm actuator and switch will be installed on the return
bus. The fuse alarm, fan power and alarm, intrusion alarm cables from
the Modular Cell cabinet will be routed and connected. The thermal
probe cable will be routed and the thermal probe placed.
Install the fuse, the fuse alarm actuator and the fuse alarm
switch in the first battery base module
A - 52
Route and attach the fuse alarm cable to the fuse alarm switch
in the battery base module
A - 53
Route and attach the fan power and alarm cable in the battery
base module
A - 54
Route and attach the intrusion alarm cable in the battery base
module
A - 55
Route the thermal probe cable and mount the thermal probe in
the battery base module
A - 56