Route and connect the four
+24V DC load cables in the
battery base module
Perform the following steps to route and connect the four +24V DC
load cables in the battery base module.
Important! Before performing the following step be sure that
the unterminated ends (Modular Cell ends) are individually taped.
................................................................................................................................
............................................
1 Lay out the four +24V DC load cables across the bottom front of the
battery base module to reach the load bus (Marked “24V”) located
inside the outer frame on the right side. Refer to the figure on Page A -
59.
................................................................................................................................
............................................
2 Remove the plastic cover that shields the 12V and 24V bus bars. Refer
to the figure below. Do not replace the cover until instructed later.
................................................................................................................................
............................................
3 Remove the nuts from the specific load bus bar locations. Refer to the
figure on Page A - 59.