User's Manual

Finishing the installation
7- 19
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
............................................................................................................................................................................................................................................................
How to finish the installation of a first or second WNG24-BC battery
.............................................................................................................................................................................................................................................................
cabinet
Finish the installation of
the first or second WNG24-
BC battery cabinet
Following installation of a WNG24-BC battery cabinet, the system
should be tested before being put into operation. System test
procedures are not covered in this installation document. Information
concerning system test and integration is contained in Lucent
Technologies Installation Engineering Handbook, 238.
Use the following procedure to finish the installation.
................................................................................................................................
............................................
1 Verify that the AC, DC, alarm and grounding connections in the primary
and battery cabinets are installed and secure.
................................................................................................................................
............................................
2 Verify all battery hardware and connections are installed and secure.
................................................................................................................................
............................................
3 Inspect for, and remove all tools, packing and installation materials, and
parts from the battery and primary cabinets.
................................................................................................................................
............................................
4 Check that all unused battery cables, if applicable, are properly wrapped
and stored on an unpopulated shelf in the battery cabinet.
................................................................................................................................
............................................
5 Check that the cabinet lifting eye bolts have been removed and replaced
with the supplied replacement bolts. If not, refer to Chapter 2 for
specific instructions.
................................................................................................................................
............................................
6 Ensure that the circuit breaker "BATTERY HEATER" in the primary
cabinet, is in the ON position
Important! When performing the next step, the doors must be
properly aligned. If not, refer to Chapter 2 to re-level the cabinet
and/or adjust the doors.
................................................................................................................................
............................................
7 Replace or close all access panels and doors of both cabinets.