General requirements
The following general requirements must be met before the installation of the RRH can
begin:
Adequate clearance must be provided for service access.
Electric service must be installed as described in Appendix C “Electrical power
requirements”.
Back haul and user alarm facilities must be installed as described in
Chapter 9, “User
alarm, and fiber optic requirements”
.
Grounding electrode system must be installed.
RF antenna runs must be installed (if required).
Tower light power must be installed (if required).
Tower light alarm must be installed (if required).
Mounting bracket holes must be drilled.
The environment must comply with limits listed in
“Environmental requirements”
(p. 5-2)
.
Cable supports and racks must be installed.
Cable support and racks
All RF cable runs, power cable runs, and facilities cable runs must be supported by a
cable support and rack system.
The according cable conduits must be provided.
Structural requirements
Pole, wall loading, and wind must be considered during site preparation.
In some cases, cell site equipment may not be mounted directly to the wall without plate
or strut to properly distribute the load.
The support structure must be designed in compliance with national building codes and
all other applicable codes.
Site requirements General site requirements
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X60W
NN-20500-305 UA08.1
Issue 0.7 November 2011
Alcatel-Lucent Proprietary
Use pursuant to applicable agreements
5-3
P
RELIMINARY
P
RELIMINARY