Network Router User Manual

Beta Beta
For final production, import color definitions from
\\daldoc01\docteam\templates\framemaker\book-template\color-defs\ production-colors.fm.
Do not import other template elements such as page layout.
To return to the draft version, import color def’ns from draft-colors.fm.
To switch to the beta version, import color def’ns from beta-colors.fm
Alcatel-Lucent
25
Beta Beta
For final production, import color definitions from
\\daldoc01\docteam\templates\framemaker\book-template\color-defs\ production-colors.fm.
Do not import other template elements such as page layout.
To return to the draft version, import color def’ns from draft-colors.fm.
To switch to the beta version, import color def’ns from beta-colors.fm
Pagination:
Numeric &
continuous
with
preceding
section of
book
OmniAccess 740 Hardware User’s Guide
Optional footer:
Manual title (to set,
redefine ManualTitle
variable)
CHAPTER 3
INSTALLING THE OmniAccess 740
This chapter guides you through the process of preparing your OmniAccess 740
(OA-740) for installation.
This chapter describes the equipment, tools, power, and site requirements for
installing the OA-740. It contains the following sections:
Preparing for Installation
Installation Checklist
Safety Measures
Site Requirement Guidelines
Power Supply Overview
General Installation
Rack-Mounting the OA-740
Installing User Modules
Before installing your OA-740, you should consider the power and cabling
requirements that must be in place at your installation site. Other factors to
consider would be the environmental conditions; the installation site should
maintain normal and safe operation of the system.