User Guide
Table Of Contents
- (START page)
- Home
- Front Matter
- Table of Contents
- OmniSwitch 6800 Series
- Installing the Hardware
- Connections and Cabling
- Booting OmniSwitch 6800 Series Switches
- Your First Login Session
- Files and Directories
- Using WebView
4 Installing the Hardware June 2007
Items Included
Your OmniSwitch 6800 Series switch order includes the
following items:
• OmniSwitch chassis
• Rack mount flanges with attachment screws (rack
mount flanges may be pre-installed on some orders)
• Power cord (country-specific)
• Documentation CD containing a complete set of user
guides for the switch and switch software. Refer to
“Related Documentation” on page 2 for a complete list of
included documentation.
Depending on the items ordered for your specific network
requirements, the following optional items may also be
included:
• Stacking cables (per order)
• SFPs (per order)
• 10 Gigabit XFP connectors (per order)
• Backup power supply components and cables
(per order)
Unpacking and Initial Setup
Unpacking the Chassis
To protect your OmniSwitch chassis and hardware compo-
nents from electrostatic discharge (ESD) and physical damage,
read all unpacking recommendations and instructions care-
fully before beginning.
Recommendations
• Unpack your OmniSwitch chassis as close as possible
to the location where it will be installed.
• Depending on your order, Small Form-Factor Plugga-
bles (SFPs), stacking cables, and backup power supply
components may be packaged separately. In order to
greatly reduce exposure to electrostatic discharge
(ESD) and physical damage, do not unpack these items
until they are ready to be installed.
Instructions
1 Carefully cut the tape along the seam at the top of the
box containing the chassis.
2 Lift the box’s top flaps. Remove any smaller boxes or
pouches that are enclosed and set them aside.
3 Lift the chassis out of the packaging.
4 Carefully remove any foam pads and protective plastic
from the switch chassis.