User's Manual

3-3
3.3
PDU STRAPPING AND CONNECTIONS
Figure 3-2 PDU (695-6200-001/002) Strapping and Connections (Sheet 1 of 2)
–+ –+
B BATTA BATT
TOP VIEW
STRAP E7 TO E15 FOR
POSITIVE INPUT VOLTAGE.
STRAP E8 TO E15 FOR
NEGATIVE INPUT VOLTAGE.
STRAP J2D TO J2C TO J2B
FOR 24V OPERATION.
STRAP J2A TO J2B TO J2D
FOR 48V OPERATION.
JUMPER E2 TO E3 AND E5 TO E6 FOR POSITIVE RACK GND.
JUMPER E1 TO E2 AND E4 TO E5 FOR NEGATIVE RACK GND.
ALSO, MOVE CHASSIS GND TO AGREE WITH RACK GND POLARITY.
SEE FIGURE 3-1, POWER CABLE ASSEMBLY INSTALLATION,
AND APPLICATION DWG 3DH031770000 EJZZA.
POWER DISTRIBUTION PANEL
FRONT VIEW – PANEL REMOVED
R3
E7
2C
2B
2A
2D
E5E2
E1 E3 E4 E6
TB4
TB3
TB2
TB1
E15
E8
CIRCUIT BOARD LOCATED INSIDE
POWER DISTRIBUTION PANEL
FRONT VIEW
NEG
'A' BATTERY
-24/-48
POS
'A' BATTERY
+24/+48
NEG
'B' BATTERY
-24/-48
POS
'B' BATTERY
+24/+48
BATTERY INPUT
WIRE SIZE NO. 4 (MAX)
LMW-7029-sm
07/12/02
rev 03/25/03