User's Manual

4-7
4.7 TEST PROCEDURES
The radio has been properly aligned and tested at the factory before shipment eliminating
the need for testing after initial turn-up. The only time testing and/or adjustment is
required is after a maintenance action such as removal and replacement procedure and/or
constant alarms requiring corrective maintenance action. The completed maintenance
action procedure(s) will reference any required test procedure(s).
4.8 PROVISIONING RADIO
Changes to provisioning do not have to be made in any particular order.
Open radio provisioning screens. On main screen, double click on tower icon. Status and
alarm screen displays. Click on Provisioning. Check current provisioning and change as
required. See
Figure 4 - 4 for recommended sequence.
Note