User's Manual

document, use and communication of its contents
not permitted without written authorization from ALCATEL
All rights reserved. Passing on and copying of this
Issue 02 -January, 10 2000 87/1363CC10875AAAA TQ BJA 02
The implementation stages for an E1 cross–connection are as follows:
1. Ports configuration: BS side and NT side: cf. § 4.11.1.3;
2. Selection of configured ports for cross–connect: cf. § 4.11.1.4;
3. Cross–connect between time–slots of selected ports: cf. § 4.11.1.5;
4. Creation of an E1 link: cf. § 4.11.1.8;
4.11.1.2 List of cross–connections
Link designation
TNT port used in the link
NT used in the link
TNT used in the link
NT port used in the link
unlocking: authorizes termi-
nal traffic: normal state
locking: an E1 link can be
deleted without disturbing traf-
fic: maintenance operation.
4.11.1.3 Configuration of BS ports
Select first of all the TNT board concerned by the cross–connect by
scrolling down the list.
Next, access the ports configuration of the TNT board selected by clicking on the first
button, shown here (on the button bar of the E1 cross–connections screen).
The screen listing the E1 ports of the TNT is displayed: