www.AlekoProducts.com ALEKO® Victoria Series Retractable Awning Instructions for Installation and Operation PLEASE DO NOT RETURN THIS PRODUCT TO THE STORE! The owner’s manual includes assembly and operating instructions, safety warnings, and the lists of parts and hardware. If you have questions about the assembly or operation of this product, or have missing or defective parts, please e-mail us at Sales@AlekoProducts.
Page 1 K D-4 J G I H F-1 Parts Diagram D-1 D-3 D-2 A-1 T B-1 A-1.Roller(left) A-2.Roller(right) A-3.Roller connector A-A-1.Bolt M4 x 15 B-1.Torsion bar(left) B-2.Torsion bar(right) B-3.Torsion bar connector B-B-1.Bolt M6 x 45 B-B-2.Bolt M6 + Washer Ø6 C-1.Front bar(left) C-2.Front bar(right) S M R L-1 N O B-B-2 J A-A-1 P B-B-1 C-1 C-3.Front bar link tube D-1.Left roller support D-2.Bolt M10 x 60 D-3.Gear box D-4.Bolt M6 x 50 E-1.Right roller support E-2.Round shaft cover F-1.
Page 2 WARNING: FAILURE TO FOLLOW THESE INSTRUCTIONS COULD RESULT IN PERSONAL INJURY! Steps of Assembly 1. Roller Assembly: Insert roller connector (A-3) into right roller (A-2), fasten it with bolt (A-A-1). Link the left roller (A-1) to the connector (A-3), fasten it with bolt (A-A-1). Now you have a full length roller. A-1 A-2 A-3 A-A-1 2. Front bar assembly: Insert front bar connector (C-3) into right front bar (C-2), fasten with bolt (A-A-1).
Page 3 4. Installation of gear box: Combine left roller support (D-1) with gear box (D-3) through bolt (D-4) M6x50, refer to Diagram 1. Then install right roller support (E-1) and round shaft cover (E-2) together as in Diagram 2. D-1 D-3 D-4 E-2 E-1 Diagram 1 Diagram 2 5. Installing of arm shoulder: Assemble arm shoulder (H), bolt M10x65 (G), washer and adjustable bolt M10x30 (I) together, refer to Diagram 3. G H I Diagram 3 6.
Page 4 Through from Through the A fabric into roller and front C bar M O 9. Front bar wrist support assembly: Blocker (P) and Arm-Bar Link (Q-1) into big trough of front bar, put both left and right plastic cover (R) to each end of the bar, then fix the Bolt for Cover & Fabric Liner (S) to the plastic cover(R). P Q-1 R S 10. Left roller support with gear box assembly: Hammer left roller support with gear box into torsion bar with gentle strength. Tighten screws with screwdriver. 11.
Page 5 12. Setting position of whole awning: Make sure two arms are tied tightly to torsion bar, move front bar wrist support (Q-1) until it connects with arms’ hole. Align the front bar and roller, tighten bolt (Q-2) of two Arm-Bar Link upwardly by screwdriver. Then fasten self locking nut M10 +Washer Ø10(Q-3) with bolts up to 95% tight using ribbon tube spanner. Lastly, Blocker (P) in centre of two arm, fasten it when awning is opened. Insert in Tight Tight 13.
Page 6 Safe installation and operation Never install it in high and windy places, as the sunshade may drop and hurt someone Don’t use it in places that have vibrations or impulsions. Don’t use it in places of high temperature such as walls near furnaces. Don’t put heavy things on the frame as it may fall down and cause damages. Please close the sunshade in windy and rainy days. Never use it for other purposes other than suggested Be careful with your fingers during installation.
Page 7 Installation Procedure 1. Measure the distance along the wall where it can be placed. Drill holes for wall brackets on the wall according to the installation distances and height of the wall brackets. The diameter and depth of hole must be the same as expansion bolts. The holes of each group must be on the same line in transversal 3.5 Inch direction and vertical direction. (Note: It is recommended to draw lines on the wall first to ensure precise position and size of the Ground holes) 2.
Page 8 Installation distance between wall brackets Awning < 10.8ft Only 2 wall brackets for each end of torsion bars Awning 10.8ft ~ 14ft 2 wall brackets at each end of torsion bar, a middle bracket in between distance of 2 arm shoulders (arm brackets refer to steps of assembly 6) Awning 14.5ft ~ 20ft 2 wall brackets at each end of torsion bar, 2 middle brackets divide into equal length in between distance of 2 arm shoulders at each end of torsion bars. (steps of assembly 6) 4.
Page 9 CAUTION: PROPER LOCATION OF THE BRACKETS IS THE MOST IMPORTANT ASPECT OF THE AWNING INSTALLATION. IT IS CRITICAL THAT YOU FASTEN ALL THE MOUNTING BRACKETS TO STUDS, JOISTS, HEADERS OR OTHER MAJOR STRUCTURAL COMPONENTS. WARNING: FAILURE TO SECURELY FASTEN ALL THE BRACKETS TO THE WALL COULD RESULT IN THE COLLAPSE OF THE AWNING AND CAUSE PERSONAL INJURY OR DEATH. 7. Instruction for front side leveling LOCKING NUTS ARM Loosen the locking nuts.
Page 10 Installation of motor bracket: Combine left roller support with motor bracket through bolt M6 x 50, see Diagram 4 above; Fixing guide: 1. Please connect the down-lead of the motor and the wire of power supply to the switch according to the diagram. (Make sure to turn off the power supply first.) 2. The stroke of the motor was placed at the maximum after production. 3. You should turn off the power supply before using the hand crank.
For more information, parts and accessories Please visit our web site: www.AlekoProducts.com PLEASE DO NOT RETURN THIS PRODUCT TO THE STORE! If you have questions about the assembly or operation of this product Or have missing or defective parts, please e-mail us at Sales@AlekoProducts.