Instructions / Assembly

2
Part 1
Install Posts
Mark the post locations with a (X) in white paint and
call 811
After utilities have been located dig holes 36” deep.
Place posts in holes and check for level and correct
distance apart. Pull the string level firm from post to
post points.
Adjust height of posts pounding down on the Posts or
adding site debris under the post to get the correct
bottom of the gate height.
Mix concrete & fill holes taking care to not move the
posts. POSTS NEED 3-4 DAYS FOR CONCRETE TO
SET.
Part 2
Gate assembly
Please assemble two part of gate with special
assembly brackets and hardware.