Specifications
Table Of Contents
- Introduction
 - Installation Procedures
 - Commissioning Procedures
 - Troubleshooting Procedures
- Overview
 - Checking for Good Wire Runs
 - Checking for Proper Termination
 - Checking the End-of-Line Device Settings
 - Checking for Proper Channel Selection
 - Checking the N2 Device
 - Checking the Number of Defined N2€Devices
 - Checking the Length of N2€Bus
 - Checking for “T” or “Y” Connections
 - Checking for a Ground Loop
 - Checking the Repeater
 - Checking the Surge Protector
 - Checking the Communication Terminal Board
 - Checking Communication Faults
 
 - Ordering Instructions
 

22 
Network Communications—N2 Communications Bus
Figure 8 shows the standard N2 Fiber layout. Notice two S.I. Tech 2110
modems are needed for each conversion to fiber: one to convert the
standard N2 signals to optics, and the other to convert optics to the
standard N2 signals.
TBC
NCU
N
C
M
To Local 
N2 Devices
To Local 
N2 Devices
To R emot e 
N2 Devices
N2 Bus
N2 Bus
Fiber
Cable
EOL=Out
EOL=In
N2FIBER1
NCM's
EOL=In
R
S.I.Tech
2110
T
Note: For end-of-line termination rules, 
  see the 
 Setting Terminations
  section of this document.
S.I.Tech
2110
RT
Figure 8: N2 Bus Layout with Fiber Modems










