SHOWER HEAD INSTALLATION INSTRUCTION
Parts List Bx1 Ax1 Template not included, create your own if needed.
According to drilling drawing sheet to (B) mark the 4 drilling positions ①, then use the Ø6mm drill to drill holes on the wall according to the marked hole position.
Fixed the top shower with the top shower fixed bar (E) , then connect with the inlet hose (F) . E A The installation is completed.