User Manual

7
MOUNTING
All P-Series Gauges and PC-Series Controllers have mounng holes for
convenient mounng to at panels. These gauges are posion insensive and
can be mounted in any orientaon. The sizes and dimensions for the mounng
holes are shown on pages 51 to 67.
P-Series Pressure Gauges may be connected into your system with the ow
going in either direcon for ease of viewing the display. These units are shipped
with a plug for dead end applicaons. This plug should be removed for ow
through applicaons.
PC-Series Vacuum and Pressure Controllers are normally intended to control
the process pressure downstream of the controller. In order for this to occur the
controller should be mounted so the ow goes from le to right as you look at
the front of the unit. This puts the measuring poron of the device between the
valve and the leakage point where you are aempng to control the pressure
applicaon. Back-pressure controllers reverse this conguraon (see page 29).
PLUMBING




Standard P-Series Gauges and PC-Series Controllers have female inlet and outlet
port connecons. Welded VCR and other specialty ngs may have male ports.
The inlet and outlet port sizes (process connecons) for dierent ow ranges
are shown on pages 51-67.
Instruments with M5 (10-32) ports have O-ring face seals and require no
sealant or tape. Do not use tape with welded or O-ring ngs.
For non M5 (10-32) ports use thread sealing Teon® tape to prevent leakage
around the port threads.
 the rst two threads. This will minimize the possibility of geng
tape into the ow stream and ow body.



When changing ngs, carefully clean any tape or debris from the port threads.

 it is recommended that a 40 micron lter be installed
upstream of P and PCR-Series instruments and a 20 micron lter be installed
upstream of PC and PCD-Series instruments.
see “Using Alicat Pressure Instruments with Fluids”, page 8.

hp://www.alicat.com/support/instruconal-videos/