User Manual

CHAPTER 2 READER HARDWARE INSTALLATION AND OPERATION
ALR-F800 HARDWARE SETUP GUIDE
DOC. CONTROL #8102141-000 REV A
16
---------------------------------------------
Network Settings:
MAC Address : 00:80:66:10:2D:12
DHCP : 1
IP Address : 10.9.8.10
Netmask : 255.255.255.0
Gateway : 10.9.8.2
DNS : 10.9.8.1
TimeServer : time-a.timefreq.bldrdoc.gov
TimeZone : -7
---------------------------------------------
Once the reader boots and you see the "Boot>Ready!" prompt, pressing
return will bring up the "Alien>" prompt.
9. Ensure the PC has compatible network settings.
In order for you to be able to connect to the reader over TCP/IP, the host
PC must be on the same subnet as the reader. If you are unfamiliar with
how to do this, consult your local IT service for assistance.
Once the initial connection is made, you may configure your reader's
network settings as you choose. Refer to the Reader Interface Guide for
instructions on how to do this.
You are now ready to bench test or demonstrate the RFID Reader system.
Bench Test Procedure
1. Position the reader so you can see the diagnostic LEDs
You may also want to position the PC so you can view the monitor
2. Access an operational mode suitable for bench testing.
Open the Alien Gateway RFID Demonstration Application.
Select Tag Grid on Gateway.
The RF ON light should illuminate.
Refer to the applicable software application user guide for specific
instructions.
3. Move a tag slowly away from the antenna’s range.
Begin with the tag well inside the expected read range (~2m or 6 ft) and
move it toward the antenna while observing the LEDs.
4. Verify the READ LED illuminates when the tag is inside the read zone.
The READ LED should illuminate green.
5. Verify the host receives the tag data.
The tag should be displayed on the monitor.
6. If bench test conditions are verified, proceed to installation.
Installation
This section provides guidance for configuring components in your RFID system.
You should consider the overall design of your specific system before
permanently mounting the equipment.