Installation manual

Lifting and Mounting Instructions B-15
Step 4: Connecting Frame 14 Enclosure Sections
1. Secure the cable connected to the PE bar on one enclosure to the PE bar
on the second enclosure using the screw provided.
2. Secure the L-shaped bus bars to the main bus bars at the top of the
enclosures with the M12 bolts, washers and nuts provided. Tightening
torque is 70N•m (619.5 lb.•ft.).
Connect grounding bars using cable
Eight M12 bolts, nuts and washers.
Note: Enclosure panels not shown for clarity only.