Installation Guide
PG 8 
4. Multi-Story Installation - Frame Openings: Frame openings in each ceiling or 
floor above the Support Box (Fig 6). These openings are to hold the Firestop 
Radiation Shields and Attic Insulation Shields. Locate each opening by dropping 
a plumb bob to the four corners of the opening below. Maintain the minimum 
clearances and dimensions as specified in Table 1. If Elbows must be used to 
avoid an obstruction, refer to the Offset Elbow Installation section. 
AllFuel HST Inc    www.allfuelhst.com  Toll Free: (833) 326-8368 










