User Guide
Chapter 2: Installation
36
3. Verify that the shipping container includes the AT-GS900/8PS Switch 
and the items shown below in Figure 4.
Figure 4. AT-GS900/8PS Switch Items
Two equipment brackets 
(for wall or rack 
installation)
Eight bracket screws (for 
wall or rack installation)
Four wall anchors (for wall 
mount installation)
Four screws and washers 
(for wall mount installation)
Four rubber feet (for 
desktop installation)
One regional AC power 
cord
One SFP slot dust cover 
(pre-installed)
Four screws (for rack 
mount installation)










