Installation guide

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide
93
2. Remove the transceiver from its shipping container and store the
packaging material in a safe location.
3. Position the transceiver with the label facing up if installing in a top slot
and with the label facing down if installing in a bottom slot.
4. Slide the transceiver into the slot until it clicks into place, as shown in
Figure 53.
Figure 53. Installing a Transceiver
5. Repeat this proced
ure to install additional SFP or SFP+ transceivers or
go to “Cabling the 10/100/1000Base-T and Fiber Optic Ports” on
page 94.
For SFP optical and cabling specifications, consult the documentation
shipped with the module.
22
SFP
2321
24
15 17 19 21R
16 18 20 22R 24R
23R
1000 / 100
SD
STATUS
FAULT
MASTER
RPS
PWR
PRES
MSTR
L/A
L/A
CLASS
1
LASER PRODUC
T
1
2
STACK
BUSY
READY
FAULT
CONSOLE
2082