Installation guide

Installation
12
Site Requirements
Make sure you observe the following site requirements:
Make sure you are placing the switch in a dust-free and moisture-free
environment.
Do not block ventilation openings on the unit.
Make sure that the switch’s power is accessible and cables can be
connected easily.
Cabling should be away from sources of electrical noise such as radios,
transmitters, broadband amplifiers, power lines, and fluorescent
fixtures.
Do not place objects on top of the switch.
Use dedicated power circuits or power conditioners to supply power to
the switch.
Desktop Installation
1. Attach the four self-adhesive rubber feet to the bottom of the switch,
positioning them in the indentations.
2. Place the switch on a flat, level surface where power is easily
accessible.
3. Attach one end of the power cord to the back of the switch and the other
end to the power source.
4. Turn on the unit by pushing the power switch in the back to the 1
position. Make sure the POWER LED on the front panel lights green.
5. Attach the data cables and observe normal operation as indicated by
the port LEDs.
Note
If you are using ports with associated MDI buttons, make sure you also
refer to Table 5.
You are done with desktop installation.