Pre-delivery Check List
Before delivering this equipment please complete the following check list.
__ 1. The loader has been installed using the appropriate mounting kit for the tractor and loader.
__ 2. The hydraulic system installed is appropriate for the tractor and loader.
__ 3. The loader is properly installed.
__ 4. All bolts are tightened to the torque speciļ¬cations shown in the torque chart.
__ 5. All safety decals are readable.
__ 6. The loader has been tested and operates properly.
__ 7. The operator's manual has been delivered to the owner who has been instructed on the safe
and proper use of the loader.
Dealer's Signature:
This check list is to remain in this owner's manual and is the responsibility of the dealer to
complete it before delivery to the customer.