Creations” moc 2.0.
Surface Mount Installation Refer to the “Assembly Diagram” attached to find the “[Stem Numbers}” referred in the following instructions. Before Installation, determine which side the door will open on, left or right, 1. Determine where you want your cabinet to be installed and which way the door to swing open. Identify where the wall stud is inside the wall and mark it. Use Wall Anchors [Item Number 14] on any screws that don’t screw directly into the wall stud. 2. Install the Bottom Mounting Bracket.
Recessed Mount Installation Refer to the “Assembly Diagram” attached to find the “[Item Numbers]” referred in the following instructions. Before Installation, determine which side the door will open on, left or right. 1. Preparation for the Installation of the Body Determine desired location of cabinet on wall. Mark the wall to show wall opening size (see Figure 1). Note: Height should be a MINIMUM of 7”* above faucet. This will allow a minimum of 1” clearance when door opens.
INSTALLATION OF SHELF SUPPORTS, SHELVES, AND HOLE PLUGS. Note: Carefully review the shelf location desired. The hole plugs are difficult to remove once inserted. 1. Select where you want the shelves robe placed. 2. Insert two (2) shelf supports at cache end of the shelf location. (Figure 1} 3. Set shelves in place on the shelf supports, gently pressing down on shelf to lock in place. (Fig.2) 4. Remove hole plugs from hardware bag and place in remaining holes.