Datasheet

3.2 Receiving procedure
3.2. Receiving procedure
Upon delivery of the Starter Kit, the following procedure must be performed:
1. check that all components are included in the shipment. By default, the QCL is
included in its housing
1
; the remainder consists of different sets of components
depending on the housing and operation mode of the laser. The default packing
lists are given in table 3.2.
LLH HHL
CW CW
TCU x x x x
LDD x x
TPG x x
x x x x
CTL x x
CTLm x x
CPL x x
CIL x x
pulsed pulsed
power cords
Figure 3.2.: Packing lists.
IMPORTANT:
The customer must control the incoming deliveries and inform ALPES
LASERS about incomplete shipments or defective goods within 30 days
after delivery.
2. before unpacking the Starter Kit components, make sure that all environmental
conditions and prerequisites are fulfilled (see sections 3.1.1 and 3.1).
3. for LLH only: mount the laser submount into the LLH housing following the
procedure presented in section 7.1.3.
4. check that the TCU voltage setting is appropriate: the fuse holder (6) on the
rear panel shown in figure 3.3 should be set to 100-120V and 60 Hz for North
America, 220-240 V and 50 Hz in Europe. If not, set the appropriate AC voltage
by setting the fuse holder in the proper position:
a) Pull out the fuse holder (3) from the socket (2)
b) check that the fuse holder is in the proper position to get the appropriate
voltage. The arrow on the fuse holder (3) should correspond to the mark
on the socket (2).
c) Insert the fuse holder (3) into the socket (2).
1
Replacement lasers are delivered in their storage box.
c
2012 SA 27