4 Unpacking & Preparation
4.1 Unpacking
Remove the strap securing the two boxes to the pallet. Inspect both boxes for physical damage.
Save all packing material and pallet for possible future use. Contact 303-473-9232 if shipping
damage is found. Carefully unpack the amplifier and transformer.
Carefully remove the amplifier and place it on a workbench or table where you can install the
power transformer.
4.2 Installing the Power Transformer
It is recommended that the power transformer be installed when the amp is at or near the place
it is to be used. The chassis of the 9500 is designed for the mechanical loads it experiences when
the amplifier is on a flat surface with the tilt-bail up or down. If the amplifier is tilted too far, such
that the transformer is cantilevered or “hanging out” to any degree, the chassis of the amplifier
can distort. This may affect a number of things, from the alignment of screw holes on the top
cover to the band-switch alignment and tension. If the amplifier is moved, even if only from one
site to another locally, remove the transformer to avoid the possibility of damage.
CAUTION:
Do not operate amplifier without the cover in place and all cover screws
installed. Do not operate the amplifier without a good RF ground connection
on the rear panel ground terminal.