Installation guide

Page 6 Installation Instructions: AM-3501 Expansion Subsystem
5.0SCSI PERIPHERAL DEVICES - INSTALLATION AND CABLING
Your subsystem cabinet can physically hold six half-height 5-1/4" peripherals, or three
full-height 5-1/4" peripherals. Filler panels in the subsystem front panel can be removed
to allow access to some of these peripherals. If you have six half-height peripherals,
four of them can be accessed through the front panel; if you have three full-height
peripherals, two of them can be accessed through the front panel.
3-1/2" hard disk drives which are mounted in 5-1/4" mounting brackets, are also
compatible with your subsystem.
The next figure shows all six peripheral device mounting positions in the Eagle
subsystem chassis. For detailed configuration instructions on a particular device, see
the installation instructions for that device.
POWER SUPPLY
The top two mounting positions
can be accessed from either side
of the chassis without having to
remove the side mounting plate.
To install peripherals in mounting
positions 3, 4, 5, and 6, you must
remove the side mounting plate.
All six peripheral mounting positions will
accommodate 3-1/2" devices. However,
before you can mount a 3-1/2" device in the
chassis, the 3-1/2" device must first be
installed in a 5-1/4" mounting bracket.
NOTE:
MC1247
1
2
3
4
5
6
Peripheral Device Mounting Positions
PDI-03501-00, Rev. A00