Instruction manual

3.1 Power Distribution Board Setup (PDB), continued
3.1.1 Replacing the Metal Oxide Varistors (MOVs)



Tools Required:
#2 Phillips screwdriver


Terminate all power to unit. Turn off battery breaker and unplug battery connector. 1.
Unplug line cord and remove all front panel connectors.
2.
and screws aside in a safe location.
3.
4.
comparable energy and voltage ratings as those you are replacing.
Replace front cover.5.
Before proceeding, remove all power from the power supply by unplugging the
power supply from the AC power source, removing all front panel connections (i.e.,

technician to potentially lethal voltages.
WARNING!
Replacement procedure:
44
017-805-B0-010 Rev. K