37
3.0 Installation, continued
3.3 PN-6x-T 7.5kW Installation
Prior to installation verify the following:
• All necessary grounding rods and materials are in place.
• Utility power run to site in accordance with the NESC (National Electric Safety Code).
• Obtained local safety practices for working with high-voltage systems.
• Gas piping, hardware, supports, and other gas carrying components to the pad location
conform to NFPA standard and local requirements.
Required Tools and Materials:
• Crane to lift enclosure from shipping pallet and place on pad
• Key(s) to enclosure doors
• Digital voltmeter
• Torque wrench with insulated handle and 1/2" socket
• 1/2" box-end wrench
• NO-OX or other suitable corrosion inhibiting agent (NCP-2)
• Silicone sealant GE RTV123 (or equivalent)
• Phillips screwdriver (for pad shear mounting)
• 5/8" socket for removing pallet mounting bolts
• Hard hats
• Utility knife
Fig. 3-8, PN-6x-T 7.5kW Sweep Dimensions (in inches)
MOUNTING STUD POSITION
O
0.625 x 1.000 4 PL
ENCLOSURE
FRONT
26.00
O
0.875GROUND SWEEP
O
3.000DC SWEEP
O
1.375AC SWEEP
0.25
3.00
5.35
5.60
7.60
0.581
3.40