Instruction Manual
13
016-559-B0-001 Rev. A
3. Locate the measuring gauge near port number 1 or 2.
2.0 Installation, continued
2.3 Cable Preparation, continued
Installation is complete. Go to Power Up and Test (Section 2.7, Power Up and Test).
5. Using heavy duty wire cutters, clip the pin as close to the
line as possible.
4. Place the connector’s collar against the edge of the
measuring gauge molded into the enclosure.