Owner's manual

Argus Technologies Ltd. 010-592-C0 Rev G WC
Printed in Canada. © 2008 Argus Technologies Ltd. ARGUS is a registered trademark of Argus Technologies Ltd. All Rights Reserved. Page 8 of 23
4.5 Recessed/Stud-mounting the FMPS
1. Select a suitable location for mounting the FMPS.
2. After removing the cover, unscrew the battery retaining brackets.
3. Drill four 3/8” holes in the side of the enclosure using the pressed dimples in the side of the enclosure as a
guide. See Figure 6. Clean any shavings from the enclosure.
4. Using a hammer and punch, knock out the DC wiring knockout on the bottom of the enclosure. See Figure 6.
5. Mount one side of the FMPS to a stud using two user-supplied 5/16” x 1” lag bolts.
6. Insert a 1/2" (typical) plywood spacer on the other side of the FMPS and secure it using two more 5/16” x 1”
lag bolts.
Figure 6–Stud-mounting the FMPS
4.6 Grounding Connection Notes
In order to provide a ready, reliable source of backup power it is necessary to establish a grounding system that
not only provides for the safety of the service personnel responsible for its operation and maintenance, but also
facilitates the proper operation and protection of the equipment within the network. Such a grounding system will
provide protection with respect to operator safety, system communication, and equipment protection.