User's Manual
Table Of Contents
- Preface
- Contents
- 1 Introduction
- 2 Safety requirements
- 3 Installation prerequisites
- 4 iRU4438 iRRH installation overview
- 5 Installing the iRU4438 iRRH
- 5.1 Assembling cables
- 5.2 Routing pre-assembled power/fronthaul Ethernet/grounding cables
- 5.3 Installing RF antennas on upper/lower omni-antenna brackets
- 5.4 Installing RF antenna cables
- 5.5 Installing the iRU4438 iRRH mounting bracket
- 5.6 Hoisting the iRU4438 iRRH on elevated structures
- 5.7 Installing the iRU4438 iRRH on the mounting bracket
- 5.8 Connecting the grounding cable
- 5.9 Connecting the fronthaul Ethernet cables
- 5.10 Connecting the 110/220 V ac power cable
- 5.11 Checking power
- 5.12 Installing the solar shield
- 6.13 Terms, Acronyms and Abbreviations
Installation prerequisites
iRU4438 iRRH Product Descripton and Installation Guide 3-1
3 Installation prerequisites
This section contains information on the documentation, tools, equipment, and
conditions required for performing the installation procedure. The document assumes
that the target audience has reasonable industry experience, is qualified, and has
installed wireless base stations in the past.
3.1 Required tools
A typical telecommunications technician's toolkit is required to complete the iRRH
installation. Additional required specialty tools and consumables are listed in
Table 3-1.
Table 3-1 Required tools
Required Tools
ESD wrist grounding
strap
Torque screwdriver and
assorted bits
Box cutter Digital voltmeter
Torque wrench, open-
end, 8
mm
Crimp tool (2 to 8 AWG)
Cordless electric
screwdriver
Cable tie tool