Installation Guide

Trove2BH2 - 3 -
A
B
C
C
C
C
C C C
C C C
Installation Instructions for Bosch Boards to TBH2:
Mounting Bosch B520 Power Supply:
1. Fasten standoffs (provided) into hole configuration (A) of backplane (Fig. 3, pg. 3).
2. Mount boards to standoffs utilizing 5/16” pan head screws (provided) (Fig. 3a, pg. 3).
Mounting Bosch B8512G/B9512G IP Control Panels:
1. Fasten lock nuts onto top two (2) pems, leaving enough space to accommodate B8512G/B9512G.
2. Slide top mounting holes of B8512G/B9512G over pems of backplane configuration (B) (Fig. 3, pg. 3).
3. Fasten 5/16” pan head screw (provided) through mounting hole of B8512G/B9512G (Fig. 3a, pg. 3).
Mounting Bosch Modules:
1. Utilize mounting bracket to mount Bosch modules to the backplane configurations (C)
(Fig. 3, pg. 3).
Bosch Board Position Chart:
Bosch Board(s) Mounting
Power Supply
B520 A
Controllers
D7412GV4, D9412GV4, B8512G, B9512G B
Access Control*
B901
C
Expansion Modules*
B299, B600, D8128D, D8125/MUX, D8129
Interface Cards*
D125B, D129, D132A, D185, D192G, D8130
SDI/2 Devices*
B208, B308, B426, B450, ICP-SDI-9114
Fig. 3
Standoff
Bosch
Sub-Assembly
Backplane
Pan Head
Screw
Pem
Fig. 3a
* These boards have the same keyhole
mounting bracket (Fig. 3, pg. 3). Position
them according to your specific design.