K-V92Z - Ventura INSTRUCTION MANUAL CORNER ENTRY PIVOT DOOR 07.
Please keep this manual and product code number for future reference and replacement parts ordering if necessary.
READ CAREFULLY AND COMPLETELY BEFORE PROCEEDING IT IS RECOMMENDED THAT YOU WEAR SAFETY GLASSES AT ALL TIMES DURING INSTALLATION INSTALLATION OVER CERAMIC TILE If your shower door is to be installed over ceramic tile, tile should extend completely under both wall jambs. Silicone should be used to seal the line where ceramic tile meets the base. HOW TO CARE FOR YOUR DOOR Never use scouring powder pads or sharp instruments on metal work or glass panels.
PACKAGING CHECK LIST & HARDWARE 5 4 7 6 3 8 9 10 2 11 1 13 1 DOOR PANEL (1) 2 WALL JAMB (A) (1) 5 6 CONNECTION TUBE (1) CONNECTOR (1) 12 9 10 11 3 4 PIVOT SIDE COLUMN (1) WALL BRACKET (1) 7 8 SUPPORT BAR (1) 12 SET OF HANDLES (1) 13 WALL JAMB B (1) FIXED PANEL (1) MAGNET SRIKE (1) BOTTOM DOOR GASKET (1) THRESHOLD (1) PAGE 1
PACKAGING CHECK LIST & HARDWARE 7 6 WALL BRACKET (1) CONNECTOR (1) 14 8 SET OF HANDLES (1) WALL PLUG (9) 16 15 17 M4 X 8 SCREW CAP (12) SCREWHOLDER (4) SCREW 5/16” LG (14) 19 18 M4 X 35 SCREW 1 3/8” LG (9) KEY (1) PAGE 2
REQUIRED TOOLS LIST LEVEL SILICON MEASURE TAPE SCREWDRIVERS DRILL HAMMER PENCIL PAGE 3
INSTRUCTION MANUAL Step ALIGN TO THE BASE MIN 33 5/8" - MAX 34 1/4” (MIN 85.41 cm - MAX 87.0 cm) 1 MIN 33 5/8" - MAX 34 1/4” (MIN 85.41 cm - MAX 87.
INSTRUC TION MANUAL Step 3 - POSITION AND CENTER THE WALLJAMBS (A & B) ONTO THRESHOLD OF SHOWER BASE. - TRACE OUTER EDGE OF WALL JAMBS.
INSTRUCTION MANUAL Step 7 Step INSERT PIVOT SIDE COLUMN (1) +MAGNET SRIKE (1) INSERT FIXED PANEL (1) 6 TIGHTEN SLOWLY TIGHTEN SLOWLY INTERIOR SHOWER SIDE Step 8 FASTENING PIVOT SIDE COLUMN + MAGNET SRIKE INTERIOR SHOWER SIDE Step 9 FASTENING FIXED PANEL (1) PAGE 6
INSTRUCTION MANUAL Step 11 PIVOT BLOCK (1) + SCREW 1” LG (2) Step 10 DOOR PANEL (1) PAGE 7
INSTRUCTION MANUAL Step 12 SUPPORT BAR (1) + SCREW 5/16” LG (2) 12A 13C 12C 12B 13B 13A Step 13 CONNECTION TUBE (1) 14D 14A 14B 14C Step 14 WALL PLUG (1) + WALL BRACKET (1) + SCREW 1 3/8” LG (1) PAGE 8
INSTRUCTION MANUAL EXTERIOR SHOWER SIDE Step 18 24 Hours SILICON SEAL EXTERIOR Step 17 BOTTOM DOOR GASKET (1) INTERIOR SHOWER SIDE Step SET OF HANDLES (1) Step 16 THRESHOLD (1) SILICONE UNDERNEATH 15 TOP VIEW PAGE 9