M-94X 05.
Please keep this manual and product code number for future reference and replacement parts ordering if necessary.
P
PACKAGING CHECK LIST & HARDWARE 11 1 UP 2 3 4 5 10 6 7 8 12 9 1 SUPPORT BAR (2) 5 STRAIGHT HANDLE (1) 9 2 WALL JAMB (2) 6 THRESHOLD (2) 10 MAGNETIC DOOR GASKET (2) 3 SIDE PANEL (2) 7 HINGE (2) 11 SIDE PANEL GASKET (1) 4 DOOR PANEL (1) 8 BOTTOM DOOR GASKET (1) 12 LEVELING BLOCKS (2) THRESHOLD (1) PAGE 1
TOOLS AND MATERIALS REQUIRED DRILL HAMMER SCREWDRIVERS MALLET MEASURE TAPE 1/8” ½’’ 1/4” 2’’ ACRYLIC DRILL BIT 6’’ 1/4” SILICONE WOODEN BLOCK ALLEN KEY CERAMIC TILE DRILL BIT CUTTING PLIER PENCIL LEVEL LONG NOSELOCKING PLIER PACKAGING CHECK LIST & HARDWARE X8 X8 a X6 X6 X2 X2 X2 b ALL PLUG SCREW 1 1/4" LG SCREW CAP SCREW 3/8" LG SCREW 3/4" LG SCREW 2 1/2” LG BOTTOM GLASS CLIP (BTM GL CLIP 1.
SHOWER DOOR INSTALLATION STEPS Step 1 CUT UP THE TEMPLATE NOTE USE TEMPLATE TO LOCATE WALL JAMB POSITION ON THE BASE TEMPLATE Step 2 PLACE THE TEMPLATE ON THE BASE THRESHOLD PAGE 3
SHOWER DOOR INSTALLATION STEPS WARNING Wall jamb must be supported and fastened with provided anchors into a stud framing.
SHOWER DOOR INSTALLATION STEPS Step 5 SLIDE THE FIXED PANEL OVER THE WALL JAMB ON BOTH SIDES 5A 5B COVER THE PLIER’S TEETH BEFOREHAND TO AVOID SCRATCHING THE ALUMINIUM PARTS.
SHOWER DOOR INSTALLATION STEPS Step 8 HINGE (2) IT IS RECOMMENDED TO HAVE TWO PEOPLES FOR THE FOLLOWING INSTALLATION STEP.
SHOWER DOOR INSTALLATION STEPS INTERIOR HANDLE (1) UP EXTERIOR HANDLE (1) 10A 10C 10B Step 10 HANDLE INSTALLATION PAGE 7
SHOWER DOOR INSTALLATION STEPS DOOR PANEL Step INTERIOR SHOWER SIDE 12 MAGNETIC DOOR GASKET (2) SIDE PANEL “ V “ GASKET SIDE PANEL Step 11 SIDE PANEL GASKET (1) UP PAGE 8
ADDENDUM INSTALLATION GUIDE 1 1 Loosen the glass clip (#1d). Align the slotte to the fixed panel. The slotted screw head should be on the inside of the shower. 2 Rest the support bar on the fixed panel inside the tub. Level it and trace an arc on the wall. 3 Isolate the wall bracket and drill a hole, using a 1/4˝ drill bit through the wall. Locate the position of this hole by way of the wall bracket. Insert a wall plug. Secure the wall bracket to the wall by way of the 2 3 4 screw.
SHOWER DOOR INSTALLATION STEPS Step 13 LEVEL FIXED PANELS SUGGESTION USE A LONG NOSE LOCKING PLIERS TO TEMPORARILY HOLD THE FIXED PANEL IN PLACE Step 14 SUPPORT BAR (2) (See Addendum) UP NON / NO Step 15 SCREW 3/8” LG + SCREW CAP (6) PRIOR TO FASTENING DOOR ASSEMBLY, VERIFY MAGNETIC DOOR GASKET ALIGNMENT AND ALL PANELS SHOULD BE LEVELED.
SHOWER DOOR INSTALLATION STEPS 24 Hours UP Step 16 SILICON SEAL EXTERIOR INTERIOR SHOWER SIDE THRESHOLD (1) Recommended: To ensure optimal leak protection, it is recommended to install the aluminum threshold by running a bead of silicone under the part and position it between the fixed panels and underneath door panel.