PDR2W-7236-CRP PDR2W-7242-CRP OWNER’S MANUAL SHOWER ENCLOSURES 2 PEOPLE REQUIRED IT IS MANDATORY TO HAVE A WALL STUD ON EACH SIDE OF THE SHOWER UNIT TO SECURELY FASTEN THE RAIL TO THE WALLS. 06.
TABLE PANNEAU OF CONTENTS FIXE / FIXED PANEL 1 PARTS LISTING ........................................................ 3 PARTS TABLE .......................................................... 4 PROVIDED HARDWARE ............................................... 5 REQUIRED TOOLS AND MATERIALS ................................. 5 WALL JAMB INSTALLATION .......................................... 6 DOOR PANEL. ......................................................... 7 RETURN PANEL..................................
15 16A 16B 16C 10 14 17 4 1 18 5 8 19 9 13 2 11 20 5 4 3 5 6 7 12 PARTS LISTING 3
1 Expander Gasket Return panel 90º glass corner clip 2 16 a 16 b 16 c 17 20 19 Door panel Wall jamb 15 18 Door panel bottom gasket1 Fixed panel gasket1 12 Return panel glass mount bracket + Low head socket screw Door panel side gasket 11 14 Threshold (return panel)H 10 13 Straight handle1 Front threshol d1 9 1 1 1 1 1 1 1 1 7 8 4 1 Bottom center guide 6 3 Door stopper 4 sets 1 QTY.
HARDWARE 21 22 23 24 25 26 27 28 29 ITEM HARDWARE QTY 21 Self-drilling screw #6-1” 4 22 Screw #12-3” 2 23 Anchor (Blanc - White) 2 24 Self drilling screw #8-1 1/4” 4 25 Wall plug (Orange) 4 26 Self drilling screw #8 - 3/8 3 27 screw cap 4 28 Hex L key 1 29 Hex L key 1 TOOLS * HACKSAW SCREWDRIVERS DRILL 1/4˝& 1/8˝ DRILL BITS SILICONE If the shower panels are to be assembled on ceramic tiles, use a 1/4˝ drill bit for ceramic tiles.
1 WALL JAMB INSTALLATION 1A Using a measuring tape, mark the center of the threshold of the base. 1A 1B Using the marking established in the previous step, run a second line up the wall. Use a level to ensure verticality of this line. B 1B 1C Place the wall jamb onto the wall while ensuring that the wall jamb holes align themselves onto the line running up the wall. Moreover, the side holes of the wall jamb (15) should face the interior of the shower.
2 DOOR PANEL Using the cardboard packaging box as platform, install bottom door gasket (13) onto door panel (15) using a block and a mallet. Notice the gasket orientation. 15 2A 15 13 INTERIOR SHOWER SIDE 16c 3 RETURN PANEL 3A 15 3A I n s t a ll t h e r e t u r n p a n e l g la s s m o u n t b r a c k e t ( 1 4 ) t o the return panel (16c) as shown. INTERIOR SHOWER SIDE 15 6 3B 3B Insert gaskets into the glass clips for bottom fixed panel (6).
3 CONTINUED 3D 3D Slide the return panel assembly (16a.b.c) into the wall jamb (15) so as to allow the return panel (16c), along with the clips for bottom of fixed panel (6), to rest on the threshold of the base. 15 16a.b 16c 15 3E 3E 16a Mark the glass clips for bottom of fixed panel (6) locations on the base, ensuring that the leading edge of the return panel is tangent to the center of threshold of the base.
4 CONTINUED 3H Ensure that the return panel (16c) is vertical by way of a level. If there need be a correction, adjust the verticality of the expander (16a) in relation to the wall jamb (15). 3H 16c 3I 3I Once the return panel (16c) has been adjusted, secure the expander (16a) to the wall jamb (15) by way of a clamp so as to keep the return panel level (16c). 15 16a 3J 3J By way of #8- 3/8 screws (26), as well as screw caps (27), permanently secure the wall jamb (15) to the expander (16a).
5 RUNNING RAIL 4 1 5A Position the stoppers (4) on the running rail (1) as illustrated. Secure them temporarily in place. 4 5B Position the wall brackets (2) on the running rail (1) as illustrated. Secure them temporarily in place.
PANNEAU FIXE / FIXED PANEL HOLDERS 6 1 GLASS 20 12 Fasten the running rail (1) to the wide fixed panel (20) with the glass holders (5). Secure them temporarily in place. INTERIOR SHOWER SIDE Ensure that the running rail (1) is at the highest p o s s ib le p o s it io n in r e f e r e n c e t o t h e h o le s o f t h e wide fixed panel (20). 5 20 WASHER 5 1 Place the return panel onto a cushioned surface, such as a towel or cardboard so as to prevent unwanted damage.
8 WIDE FIXED 8A Position the wide fixed panel assembly on threshold of the base (B) as shown. Adjust the wall bracket (3) as well as the return panel glass mount bracket (14) so as to ensure that the running rail (1) is secured. 1/2” max (12.7mm) 3 20 20 12 The bottom guide (7) can hang off the threshold (B) as long as it can be well-fastened. 7 20 INTERIOR SHOWER SIDE B B 8B Ensure that the fixed panel gasket (12) collapses against the wall properly.
9 WIDE FIXED PANEL 9A 3 3 Mark the screw locations for the wall brackets (2) on the walls on both sides of shower as well as the placement the glass clip (14) and bottom center guide (15). 6 7 7 6 6A 9 THRESHOLD S 9A Remove the wide fixed panel assembly (7) so as to allow placement of the threshold (13) onto the base. Ensure that a bead of silicone (S) is applied to the underside of the threshold before installing.
10 WIDE FIXED PANEL 3 10A 21 1 1 Remove running rail (1) from wall brackets (3). Drill holes in walls with a drill bit, intended for ceramic tiles, through to the wall stud. Fasten the wall brackets (3) with #12-3 (22). 3 WALL STUD 3 22 3 20 10A Insert large fixed panel (20) back, ensuring that it’s placed in the bottom glass clip (6) and bottom center guide (7). Slide expanders (E) to bridge the gap over wall bracket for running rail (3) as well as glass mount bracket for return panel (14) .
11 SMALL FIXED PANEL INTERIOR SHOWER SIDE 11A Insert the bottom bottom glass clip (14) against the front threshold (9), ensuring that the prescribed distance from the inside of the return panel (16c) is respected. Screw down the glass clip (6) using a #6-1 ˝ selfdrilling screw (21) and insert the gasket. 11A 21 1 1/2” (38 mm) 6 11B 11B 18 Place small fixed panel (8) within bottom glass clip (14). 11C 11C Fasten the small fixed panel (8) to the running rail (1) by means of the glass holders (5).
12 DOOR PANE L 12A 2 Assemble a set of double rollers (2) to the door panel’s (19) top holes, as illustrated. 19 INTERIOR SHOWER SIDE 12B 19 Install door panel (19), ensuring that the rollers (2) are positioned over the running rail (1). Ensure that the door panel (19) is placed within the bottom center guide (7).
12 CONTINUED WASHER 12C 2 Install set of double rollers to the bottom holes of door panel (19), making sure that they are tangent to the running rail (1) by way of the excentric washers. 1 3 WASHER 13 STRAIGHT HANDLE Install straight handle (8) onto door panel (19). Ensure that clear washers on either side of glass are installed.
GASKET PANEL 13 DOOR PANEL SIDE / FIXED 13 Install door side gasket (11) onto sliding door panel (19). 19 11 1/2” (12.
12 STOPPERS 10 Adjust the position of the stoppers (4) so as to ensure a maximum opening and closing range. 4 DOOR CLOSED MAX 1/2” (6.35 mm) 1 19 DOOR OPEN APPROX. 3” (76.2 mm) 19 13 SILICONE Apply silicone (S) between the bottom of the fixed panel and the threshold of the base. Silicone application along the length of the threshold is also suggested. In both cases, it is done from the outside of the shower area.