80 Commissioning
Chapter 3 - Commissioning
3.2 Operation Verification
The following sections describe how to verify the correct functioning of the
Outdoor Units, Indoor Units, Ethernet connection and data connectivity.
3.2.1 AU-ODU LEDs
To verify the correct operation of the AU-ODU, examine the LED indicators located
on the bottom panel of the outdoor unit.
The following tables list the provided LEDs and their associated indications.
3.2.2 Base Station LEDs
To verify the correct operation of the Base Station equipment, examine the LED
indicators located on the front panels of the modules. The following tables list the
LEDs of the Base Station modules and their associated indications.
NOTE
Verifying the correct operation of the Outdoor Unit using the LEDs, as described below, is only
possible after the configuration of basic parameters has been completed.
Table 3-2: AU-ODU-LEDs
Name Description Functionality
PWR Power indication
Off - Power failure
Green - Power to ODU is OK, internal 3.3
VDC power supply is OK.
ALARM IDU-ODU communication
and synthesizer status
indication
Off - IDU-ODU communication is OK,
synthesizer is locked.
Red - IDU-ODU communication failure or
synthesizer is not locked
ETH Not Used