User Manual

Chapter 2 - Installation Installing the Antennas
4Motion 71 System Manual
2 Install the antennas according to the planned azymuth. It is recommended to
use the Adjustable Downtilt Kit and set it at 0 degrees downtilt. Refer to the
installation instructions supplied with the antennas.
3 Install the Remote Cable Outdoor Termination Unit(s) according to the
instructions supplied with the unit. The placement of the unit(s) should enable
connection of all the AISG Remote Cables to the antennas. Connect all the
cables to the antennas. If needed, connect the two units using the
pre-prepared cable.
4 Connect the long AISG Remote Cable to the Remote Cable Outdoor
Termination Unit and route it to the location of the Remote Cable Termination
Panel. Connect it to the Panel according to the instructions supplied with the
Panel.
5 Connect the AISG Antenna Controller to the Remote Cable Termination Panel
and set to downtilt of each antenna to the desired angle. For recommendation
on typical downtilt required in various scenarios refer to “Antenna Down-Tilt
Guidelines” on page 842.