User's Manual

Table Of Contents
22 Installation
Chapter 2 - Installation
2.1 Installing the ODU of the PRO-S CPE
The following sections describe how to install the outdoor unit (ODU) of the PRO-S
CPE.
2.1.1 ODU Installation Requirements
2.1.1.1 Packing List
ODU
Pole mounting kit
2.1.1.2 Additional Installation Requirements
The following items are also required to install the ODU:
Indoor-to-outdoor Category 5E Ethernet cable with two shielded RJ-45
connectors* (see Section 2.1.3 for details on approved cables and maximum
length), and an RJ-45 connectors crimping tool.
For units that connect to an external antenna (SE model): Antenna* and RF
cable* for connecting the antenna to the ODU.
SAU* (SU Alignment Unit) for antenna alignment and status verification.
Grounding cable with an appropriate termination.
Installation tools and materials, including appropriate means (e.g. a 1" to 4"
pole) for installing the ODU (and antenna where applicable).
2.1.1.3 Optional Items
Tilt Pole Mounting kit*.
To connect directly to the ODU for configuration/performance monitoring: A
special Y-cable* and a Notebook or PDA with web browser.
NOTE
Items marked with an asterisk (*) are available from Alvarion.