User's Manual

Table Of Contents
Installing the Si CPE
BreezeMAX CPEs Product Manual 39
Figure 2-12: Si CPE Top View (Without RF Connector's Cover)
Table 2-7: Si CPE Top Panel Components
Name Description Functionality
STATUS Status Indication
Off - CPE is not powered or power failure
Green - CPE is connected with a base station
Red - CPE failure
Orange - After power-up (if power supply is ok) until start of
self test, after passing self-test until network entry is
completed, or upon restarting the network entry process.
Blinking Orange - CPE is being set to Factory Defaults (during
6 seconds after pressing the RESET button for more than 5
seconds).
Blinking Green - If SIGNAL LEDs 5, 6 and 7 are on:
Authentication reject by RADIUS server.
If SIGNAL LEDS 6 and 7 are on: Rejected by Base Station
(Duplicate SU Name in database).
If LED 7 is on: Authentication Timeout, re-authentication failure
(connection to RADIUS server lost).