User's Manual

Table Of Contents
Installing the Si CPE
BreezeMAX CPEs Product Manual 41
2 Verify that the orange Status LED located on the unit's top panel illuminates,
indicating that the power supply to the unit is OK and the unit is not yet
connected to a Base Station (the LED will change to green when the unit is
connected to a Base Station).
3 If a detached antenna is used, remove the cap on the unit's top panel to expose
the RF connector and connect to it the RF cable supplied with the antenna.
Install the antenna using the instructions provided in Section 2.4 on page 42,
and connect to it the other end of the RF cable. To tighten the SMA connectors,
use only the torque key supplied with the antenna.
4 Configure the basic parameters as described in Section 3.3.1.
5 Align the antenna as described in Section 3.5.
6 Connect the 10/100 Base-T ETHERNET connector to the data equipment. The
cable connection should be a crossed Ethernet if connecting to a hub/switch
and a straight cable if connecting directly to a PC Network Interface Card
(NIC).
Verify proper operation of the Ethernet link. The Ethernet Integrity green LED
should be on and the Ethernet Activity yellow LED should blink when there is
Ethernet traffic. To verify data connectivity from the end-user's PC or from a
portable PC connected to the unit, ping a known device in the network, or try
connecting to the Internet.
2.3.5.2 Wall Mounting the Si CPE
The wall mounting kit for the Si CPE includes a bracket, 2 screws, and 2 plastic
anchors. Refer to Figure 2-14.
1 If anchors are needed (wall-board, plaster board, etc.), drill two holes for the
anchors using a 6 mm drill bit and insert anchors. The distance between the
two holes should be 86 mm. Use the drilling template supplied with the Si
CPE.
2 Fasten the two screws provided with the kit directly to the anchors.
NOTE
The color codes of the power cable are as follows:
Brown
Phase ~
Blue Neutral 0
Yellow/Green Ground