User's Manual

Table Of Contents
58 BreezeMAX CPEs Product Manual
Chapter 3 - Commissioning
3.1 Commissioning Steps
After completing the installation process, as described in the preceding chapter,
several actions should be performed to ensure connectivity with the Base Station
and provisioning of services. After the SU is connected with the Base Station, it
can be fully managed via the wireless link from the Base Station or a central
management system:
1 The basic parameters must be configured to ensure that the unit operates
correctly and can communicate with the Base Station.
2 The antenna must be aligned to ensure optimal performance of the wireless
link.
3 Proper operation should be verified, including data connectivity.