User's Manual
Table Of Contents
- BreezeMAX CPEs Product Manual
- About This Manual
- Contents
- Figures
- Tables
- Chapter 1 - Products Description
- 1.1 BreezeMAX CPEs
- 1.2 Introducing BreezeMAX PRO-S CPE
- 1.3 Introducing BreezeMAX Si CPE
- 1.4 Voice and Networking Gateways
- 1.5 PRO-S CPE Specifications
- 1.6 Si CPE Specifications
- Chapter 2 - Installation
- 2.1 Installing the ODU of the PRO-S CPE
- 2.2 Installing the IDU-1D Indoor Unit of the PRO-S CPE
- 2.3 Installing the Si CPE
- 2.4 Installing the 3.5 GHz Detached Antenna
- 2.5 Installing the 2.3/2.5 GHz Detached Antenna
- Chapter 3 - Commissioning
- Chapter 4 - Operation
- 4.1 The SU Installer Monitor Program
- 4.2 Using the Monitor Program
- 4.3 The Main Menu
- 4.4 Unit Control Menu
- 4.5 Registration Parameters Menu
- 4.6 BST/AU ID Parameters Menu
- 4.7 Radio Parameters Menu
- 4.8 Multirate and ATPC Parameters Menu
- 4.9 Performance Monitoring Menu
- 4.10 FDD Parameters (3.3/3.5/3.6 GHz units only)
- 4.11 SU Parameters Summary
- Appendix A - The Web Configuration Server
- Appendix B - Troubleshooting
- Glossary
62 BreezeMAX CPEs Product Manual
Chapter 3 - Commissioning
3.3 Aligning the PRO-S CPE’s Antenna
3.3.1 Fast Configuration and Antenna Alignment
(PRO-S CPE)
A special Y-cable, available from Alvarion, enables to connect a Pocket PC (or a
portable PC) directly to the IDU COM port of the ODU. This enables the installer to
perform the entire process of configuring basic parameters, aligning the antenna
and verifying proper operation of the unit right after completing the installation,
minimizing the number of times the installer must climb to the roof.
1 Disconnect the IDU-ODU cable from the ODU.
2 Connect the Y-cable according to the following drawing:
To use a Pocket PC/Notebook for completing the entire installation process on the
roof:
Figure 3-1: Connecting the Y-Cable