User's Manual

Chapter 2 - Hardware Description BU/RB-B300D-5X
Alvarion BreezeNET B300 21 Technical User Manual
2.4 BU/RB-B300D-5X
2.4.1 Installation Guidelines
1 Unpack the equipment
2 Check items integrity
3 Prepare RF-cables of the required length. The recommended maximal RF cable
length is 1 meter.
4 Install and isolate the connectors on the RF cables
5 Determine the STP cable length that is used to connect IDU and ODU. The
total cable length between LAN (behind IDU) and ODU should not be longer
than 100 meters. Service cable connecting IDU and ODU should be STP Cat
5E cable.
6 Install (solder) connector for ODU on the STP cable and isolate it
7 If it is possible to lay STP cable with a connector on the IDU side, install
(solder) connector for IDU on the STP cable and isolate it
8 Lay the STP cable "from top to bottom" - from ODU to IDU
9 If step 7 is not accomplished, after the STP cable has been laid, install (solder)
connector for IDU
10 Install ODU on the mounting bracket connectors down and tighten it
Figure 2-10: BU/RB-B300D-5X Installation 1