User's Manual
Table Of Contents
- BreezeNET B130/B300 GigE Technical User Manual
- Chapter 1 - Getting Started
- Chapter 2 - Hardware Description
- 2.1 Power supply units (IDU)
- 2.2 Outdoor Units (ODU)
- 2.3 Installation Preparations
- 2.3.1 Required Components and Accessories
- 2.3.2 Antenna Placement
- 2.3.3 Antenna Poles Usage
- 2.3.4 Poles with Stretching
- 2.3.5 Wall Mounted Pole
- 2.3.6 Antenna Poles Requirements
- 2.3.7 Grounding when Using IDU-BS-G
- 2.3.8 Antenna Alignment
- 2.3.9 Precaution Measures
- 2.3.10 Service Cable Soldering Procedure
- 2.3.11 Tools Required at the Installation Site
- 2.4 BU/RB-B130D/B300D-5X-GigE
- 2.5 BU/RB-B130/B300-5X-GigE
- 2.6 Mounting Kit (MOUNT-KIT-85)
- 2.7 Specifications
- Chapter 3 - Basic Configuration Instructions
- Chapter 4 - Link Configuration
- Chapter 5 - Configuration Via Web Interface
- Chapter 6 - Supplementary Information
Chapter 2 - Hardware Description Installation Preparations
Alvarion BreezeNET B130/B300 GigE 16 Technical User Manual
2.3.8 Antenna Alignment
To obtain maximal system performance antennas must be precisely aligned one
towards another according to LOS requirements. General recommendations for
antenna alignment are the following:
Align antennas using optical equipment (binoculars, spyglass) accompanied
by mobile phone actions coordination
Use GPS receiver and area map
Use build-in Device features. These features allow evaluating current
channel/signal quality and perform precise antenna alignment
2.3.9 Precaution Measures
Before you start the installation please read this section very carefully.
Figure 2-9: Grounding